Palram Silver Line Instructions De Montage page 28

Masquer les pouces Voir aussi pour Silver Line:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

32
Firmly connect the
greenhouse to its final, level
position immediately after
completion of the assembly,
to withstand high winds
effects.
The pegs M307 (spikes) are
assembled from the inside
of the greenhouse. Make
sure to use the pre-punched
notch in the bottom of the
base.
M307
M307 / 4

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Green line

Table des Matières