Palram Silver Line Instructions De Montage page 26

Masquer les pouces Voir aussi pour Silver Line:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

28
Insert the door lower track
A192 inside the special
aluminum rail A162 (a),
simultaneously with the
door wheels into the upper
track A222. After you
assemble the door to its
place, assemble screw and
nut 411,412 into the door
stopper hole on profile
A222(b).
A222
411
412
b
a
29
Tighten all screws and nuts.
The greenhouse includes
special screws and nuts
tighten them with
reasonable force.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Green line

Table des Matières