August View Doorbell Cam Manuel D'installation Et D'utilisation page 9

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3. Mark the holes
• Align the wedge with your mark on the wall.
• Using a pencil or other marking device, mark the location of the two screw holes in the
wedge.
• Remove the wedge from the wall.
Mark in these screw holes
4. Drill the holes (if necessary)
• Some surfaces, like wood and composite siding, may not require drilling holes first.
You may be able to simply screw in the included screws.
• Refer to the drill bit chart to determine what type of installation is appropriate for
your wall.
8

Publicité

Table des Matières
loading

Produits Connexes pour August View Doorbell Cam

Ce manuel est également adapté pour:

ChimeAb-r3

Table des Matières