Zephyr Siena Guide D'utilisation, D'entretien Et D'installation page 11

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

CAUTION: At least two installers are
required due to the weight and size of the
hood.
fasten screws all the way. Note: wood blocking may need
to be added behind the drywall if no studs are present.
Wall anchors may also be used but check local codes
for compliance. Failure to use suitable wall anchors
and screws to hold the weight of the hood could result
in personal injury or damage to cooking surface or
counter.
9. If ducting hood through rear of hood body, cut access hole
in wall and prepair ducting.
the last M4 x 38 screws to further secure the hood to the
wall from inside the hood on line B.
12. Position electrical outlet within the space covered by the
telescopic duct covers and where it will not interfere with
15. Place telescopic duct covers onto hood and extend inner
*If using hood in recirculating mode you must secure air
covers. Turn to page12 for more details.
WARNING: Electrical wiring must be done by a qualified person(s) in
accordance with all applicable codes and standards. This range hood must be
properly grounded. Turn off electrical power at service entrance before wiring.
C
B
A
C E N T E
9
C/L
Duct Cover
Bracket
9-7/16"
12-3/4"
13-1/8"
26" min
C/L
C
B
FIG. A
H O O D
R L IN E
4 ¼ "
M A X .
2 4 "
M A X .
1 2 "
FIG. B

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Zsi-e30bsZsi-e36bs

Table des Matières