Electrical installation
Power supply
Fuse protection
RCD
Pre-installation
> Installing a permanent power supply line:
• Preconnect a separate fuse and
residual current operating device (RCD)
• Preconnect an allpole separating main switch
outside the prescribed safety areas (0 2)
• Allow the supply line to protrude by 3,000 mm
> Laying the potential equalisation cable:
• Allow the cable to protrude by 3,000 mm
18
Connecting the whirltub (Diagram 18)
NOTE! Avoiding any malfunctions!
• Do not fasten the cables together with cable ties.
• Do not install the supply line parallel to the control
cables.
I
Connect the supply line to the mains supply
socket.
II
Connect the potential equalisation cable to the
whirltub.
76xxxx xx x xx xx00: 50 Hz, 220 - 240 V AC
76xxxx xx x xx xx06: 60 Hz, 220 - 240 V AC
I
= 16 A
N
I
≤ 30 mA
ΔN
0
6 0
1
0
I
L
N
PE
II
6 0
0
2
* or the height of
the highest shower
head / water outlet
that is permanently
installed; depending
on which is higher
WH_M_Paiova_angeformte_Verkleidung/21.04.7
7