INSTRUCTIONS. USE CAUTION WHEN USING THIS UNIT.
1. PARTS LIST
1 x BACKBOARD
1 x METAL (BASKETBALL) RING
1 x NYLON NET
6 x SCREWS (DYNABOLTS ARE RECOMMENDED FOR THIS APPLICATION,
DYNABOLTS NOT INCLUDED) .
2. TOOLS REQUIRED
DRILL
10MM MASONRY DRILL BIT
LADDER
M12 SPANNER
6 x 10MM RAM PLUGS OR PLASTIC DOWELS
INSTALLATION INSTRUCTION
⚫
UNPACK ALL COMPONENTS AND CHECK FOR COMPLETENESS.
⚫
BEFORE ASSEMBLING TO WALL CHECK WITH REGISTERED BUILDER OR PROFESSIONAL
ENGINEERS THAT THE WALL IS A SUITABLE LOAD BEARING WALL.
⚫
PLACE THE BOARD IN THE REQUIRED POSITION AND MARK THE 6 HOLES THROUGH THE BOARD.
(ENSURE NONE OF THE HOLE ARE INTO THE MORTAR)
⚫
THE HEIGHT OF THE RING SHOULD BE 3.05M (10 FEET) FROM THE GROUND.
⚫
DRILL THE SIX HOLES, (55MM DEEP) WITH MASONRY DRILL.
⚫
KNOCK THE RAMPLUGS OR PLASTIC DOWELS INTO ALL HOLES.
⚫
FIT THE BACKBOARD TO THE WALL USING 2 TOP SCREWS FIRST.
⚫
FIT THE REMAINING 4 SCREWS THROUGH THE RING AND BACKBOARD.
NOTE: THE HOOKS ON THE RING MUST FACE DOWN.
⚫
HANG THE NET. THE RED SECTION OF NET TO THE TOP.
⚫
IF YOU ARE UNSURE OF ANY OF THE ASSEMBLY SEEK PROFESSIONAL ADVICE.