Task 2: Mounting Vessjbod In A Rack - Promise Technology VessJBOD 1740 Guide De Démarrage Rapide

Masquer les pouces Voir aussi pour VessJBOD 1740:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 38

Task 2: Mounting VessJBOD in a Rack

The VessJBOD subsystem installs to the rack using the available mounting rails.
You can also use your existing rails.
Figure 4. VessJBOD mounted in a rack with the available rails
Vertical Rack Post
Handles mount
outside the rack post
To install the VessJBOD subsystem into a rack with the available mounting rails:
1.
Check the fit of the mounting rails in your rack system.
2.
Adjust the length of the mounting rails as needed.
At least two persons are required to safely lift, place, and
attach the VessJBOD subsystem into a rack system.
Do not lift or move the VessJBOD subsystem by the handles,
power supply or the I/O module. Hold the subsystem itself.
Only a qualified electrician who is familiar with the installation
procedure should mount and install the VessJBOD
subsystem.
Be sure all switches are OFF before installing the VessJBOD
subsystem or exchanging components.
Task 2: Mounting VessJBOD in a Rack
VessJBOD subsystem
Mounting rails mount
outside the rack post
Cautions
5

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Vessjbod 1840

Table des Matières