18
Installation
Minimum Clearance
2
This product must be installed with clearance at the left, right, top, bottom and front of the product
as shown in the figure.
Only the battery can be installed at the bottom clearance space of the product. If you install the
battery unit at the bottom clearance space, leave the clearance space between the battery and the
product more than 300 mm.
Be sure not to block right side of the installed PCS. Risk of serious injury due to high temperature.
Minimum clearance (dual batteries)
3 0 0 m m
3 0 0 m m
3 0 0 m m
3 0 0 m m
3 0 0 m m
3 0 0 m m
3 0 0 m m
3 0 0 m m
3 0 0 m m
3 0 0 m m
1 6 0 0 m
m
3 0 0 m m
1 6 0 0 m
m