4.2

Installation site requirements

WARNING
The boiler must be installed by a qualified installer in
accordance with local and national regulations.
WARNING
The following instructions shall be observed when
determining the installation site.
▪ Mount this unit on vertical, flat walls only.
a
a
Vertical, flat wall
▪ The boiler can be installed outdoors in a partially protected
location. A partially protected location is a place where the boiler
is not exposed to the direct action and to the penetration of
atmospheric precipitation (rain, snow, hail,...).
The boiler can also be installed inside of an outside wall using the
appropriate in‑wall kit.
In
case
of
outdoor
installation,
(DRANTIFREEZxx ) to prevent the piping and condensate trap
from freezing.
▪ Flammable fluids and materials must be stored at least 1  metre
away from the boiler.
▪ The wall on which the unit is mounted should be strong enough to
carry the unit's weight. Build a reinforcement if necessary.
▪ The following minimum clearances are required for servicing:
180  mm above the casing*, 200  mm below, and 10  mm at each
side. 500 mm at the front clearance may be realised by opening a
cupboard door. See
"Minimum installation clearances"  on
page 9.
▪ For easier use of control panel, it is recommended that boiler
bottom is 1500 mm from the floor, for easier part replacement side
clearances should be 50  mm where applicable. See
installation clearances" on
page 9.
▪ If the boiler is installed in a room or compartment, it does not
require a dedicated ventilation for combustion air. If however
installed in a room containing a bath or a shower, then particular
reference is drawn to the current I.E.E. Wiring Regulations, local
Building Regulations or any other local regulations currently in
service.
▪ The intake air must not include chemicals that may cause
corrosion, toxic gas formation and even risk of explosion.
▪ If the wall on which the unit is mounted, is flammable, a non-
flammable material must be placed between the wall and the unit
and also at all locations through where the flue piping passes.
D2C20ND028A5AA + D2C24ND035A5AA
Wall-mounted condensing boiler
3P469346-10J – 2018.05
use
the
antifreeze
kit
"Minimum

Minimum installation clearances

b
a
a
d
d
c
e
Minimum allowable clearances
a, sides
b, Above the casing*
c, below
f, in front
Recommended clearances for easy servicing
d, sides
e, below (from the floor)
*
180 mm is for the case that 60/100 90° elbow is connected
to the flue outlet of the boiler.
b = 270 mm in case that 60/100 to 80/80 adapter + 90°
elbow 80 are connected to the flue outlet of the boiler.
b = 280 mm in case that 60/100 to 80/125 adapter + 90°
elbow 80/125 are connected to the flue outlet of the boiler.
4.3

To unpack the unit

1 Unpack the unit as shown on top of the packing case. The
following items must be included in the package:
a
b
c
d
j
a
Boiler
b
Operation manual
c
Installation manual
d
Wall-mounting bracket
e
Installation template
f
Dowels and screws
g
Condensate hose
h
Cable glands 2×PG 7, 1×PG 9
i
Energy label
j
Condensate trap
2 Check the contents of the package. If any of them is damaged
or missing, contact your dealer.
CAUTION
Store the remaining parts of the package (cardboard,
plastic, etc.) in a place children cannot reach. The
manufacturer is not responsible for any accidents and/or
damage that may occur this way.
4 Installation
f
10 mm
180 mm
255 mm
500 mm
50 mm
1500 mm
e
f
g
h
i
Installation manual
9

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

D2c24nd035a5aa

Table des Matières