EuroLite B-10 Mode D'emploi page 15

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

The installation of the device has to be built and constructed in a way that it can hold 10 times the weight for
1 hour without any harming deformation.
The installation must always be secured with a secondary safety attachment, e.g. an appropriate catch net.
This secondary safety attachment must be constructed in a way that no part of the installation can fall down
if the main attachment fails.
When rigging, derigging or servicing the device staying in the area below the installation place, on bridges,
under high working places and other endangered areas is forbidden.
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert before taking into operation for the first time and after changes before taking into operation another
time.
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert after every four year in the course of an acceptance test.
The operator has to make sure that safety-relating and machine-technical installations are approved by a
skilled person once a year.
Procedure:
The device should be installed outside areas where persons may walk by or be seated.
IMPORTANT! OVERHEAD RIGGING REQUIRES EXTENSIVE EXPERIENCE, including (but not limited to)
calculating working load limits, installation material being used, and periodic safety inspection of all
installation material and the device. If you lack these qualifications, do not attempt the installation yourself,
but instead use a professional structural rigger. Improper installation can result in bodily injury and or
damage to property.
The device has to be installed out of the reach of people.
The device must never be fixed swinging freely in the room.
Caution: Devices in hanging installations may cause severe injuries when crashing down! If you have
doubts concerning the safety of a possible installation, do NOT install the device!
Before rigging make sure that the installation area can hold a minimum point load of 10 times the device's
weight.
The device must be installed in an absolutely horizontal position.
Always install the device via all fixation holes.
Do only use appropriate screws and make sure that the screws are properly connected with the ground.
Before taking into operation for the first time, the installation has to be approved by an expert!
Procedure:
Step 1: Unscrew the screws on top of the ball.
Step 2: Remove the ball from the housing cover.
Step 3: Unscrew the hexagon nuts with washer on the housing cover. If needed, you have to hold the
screws on the bottom of the housing with a cross screwdriver in order to loosen the nuts.
Step 4: Carefully remove the housing cover from the baseplate.
Step 5: Hold the baseplate onto the location where the B-10 is to be installed.
Step 6: Mark the boreholes with a pen or a suitable tool.
Step 7: Drill the holes with a 6-mm drill and use 6-mm dowels.
Step 8: Make sure that the counter-nuts of the baseplate-screws are fixed.
DANGER TO LIFE!
15/31
51812235_V_1_2.DOC

Publicité

Table des Matières
loading

Table des Matières