Cola SPRINT maiolica Série Manuel D'installation page 49

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Before working on the sheet metal tile holder, bend the tabs inward with suitable equipment to minimise
the play and ensure proper stability of the tile.
Fit the tiles checking the final coupling.
Position the upper tile in its place. Refit the
complete front panels, fixing them with the
screws (step 5).
Connect the power cable to the household
electrical system and turn on the stove, checking
its proper operation and following the instructions
in the manual supplied.
49
SPRINT ** maiolica

Publicité

Table des Matières
loading

Table des Matières