Connecting Dhw Installation - Daikin Altherma C Gas W EKOMBG22ABV1 Instructions D'installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 107
5.2

Connecting DHW installation

1.
Rinse the installation carefully.
2.
If required, assemble an inlet combination.
3.
Assemble the cold (D) and warm water pipe (D) to the connection set.
Comments
If the unit is only used for warm water supply, the heating function can be switched
off using the service code on the operating panel. The CH installation does not need
to be connected or filled.
If the unit is switched off during winter, and is disconnected from the electricity
supply, the sanitary water must be drained in order to prevent freezing. To do so,
disconnect the tap water connections straight underneath the unit.
In case of old installations or domestic hot water circuits which can contain small particles,
install a filter in the domestic hot water circuit.
This pollution could cause a fault during domestic hot water operation.
Resistance graph tap circuit unit
A. EKOMBG22ABV1
B. EKOMBG28ABV1
C. EKOMBG33ABV1
X. Water pipe pressure (Bar)
Y. Flow rate (L/min, tolerance ± 10%)
Daikin Europe NV
D
C
020601015
17

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Altherma c gas w ekombg28abv1Altherma c gas w ekombg33abv1

Table des Matières