Télécharger Imprimer la page

Sojag 500-6158274 Guide D'assemblage page 36

Publicité

ASSEMBLY
NOTE:
Two people are required to install the roof panels.
Install one panel at a time beginning with the left panel.
IMPORTANT:
Ensure each screw installed on this step is
attached to a spacer (M5).
Step 19
19.1 Overlap the roof panels as shown on the
illustration 1.
19.2 Place the roof panels as shown on the
illustration 2 and place a spacer (M5) between
the roof panels and the structure, align the
pre-drilled holes on the roof panels with the
pre-drilled holes on the spacer (M5). Refer to
the illustrations 3 to place the spacer (M5).
19.3 Screw the roof panels to the structure using
the screws (S, T, X1, and U). Refer to the
illustrations 3.
Parts required for this step / Pièces requises pour cette étape :
U
2
X
N
2
X
O
2
X
36
S
28
X
N1
2
X
O2
2
O1
X
© Sojag inc. 2016
ASSEMBLAGE
NOTE :
Deux personnes sont requises pour assembler le toit.
Installer un panneau à la fois en débutant avec le panneau de gauche.
IMPORTANT :
Assurez-vous que chaque vis installées à cette
étape soit attachée à un entretoise (M5).
Étape 19
19.1 Emboiter les panneaux de toit comme indiqué
à l'illustration 1.
19.2 Placer les panneaux de toit sur la structure en
positionnant les entretoises (M5) entre les
panneaux de toit et la structure à chaque
endroit où se trouvera une vis. Référez-vous à
l'illustration 2 pour le positionnement des
panneaux et aux illustrations 3 pour le
positionnement des entretoises.
19.3 Attacher les panneaux de toit à la structure en
utilisant les entretoises (M5) et les vis (S, T,
X1 et U). Référez-vous aux illustrations 3.
M5
124
X
N1a
2
X
2
X
Need help? Besoin d'aide ?
T
90
X
X1
4
X
Na
2
X
O3
2
X
O4
2
X

Publicité

loading

Ce manuel est également adapté pour:

959863