5. Set and start the correct programme
for the type of load and the degree
of soil.
7.1 Using the detergent
A
B
30
20
7.2 Setting and starting a
programme
Setting mode
The appliance must be in setting mode
to accept some operations.
The appliance is in setting mode when,
after the activation:
• All the programme indicators come
on.
• The display shows two horizontal sta-
tus bars.
If the control panel shows other condi-
tions, press and hold Delay and Start at
the same time until the appliance is in
setting mode.
Starting a programme without
delay start
1. Open the water tap.
2. Press the on/off button to activate
the appliance.
3. Close the appliance door.
4. Make sure that the appliance is in
setting mode.
5. Press Program again and again until
the indicator of the programme that
you want to set comes on.
• The programme duration flashes in
the display.
• The phase indicators of the set
programme come on.
1.
2.
3.
A
+
-
4.
C
5.
6. If you want, you can set the options.
7. Press Start. The programme starts.
Starting a programme with
delay start
1. Set the programme and the options.
2. Press Delay again and again until the
3. Press Start. The countdown starts.
• When the countdown is completed,
Opening the door while the
appliance operates
If you open the door, the appliance
stops. When you close the door, the ap-
Press the release button (B) to open
the lid (C).
Put the detergent in the compart-
ment (A) .
If the programme has a prewash
phase, put a small quantity of deter-
gent on the inner part of the appli-
ance door.
If you use detergent tablets, put the
tablet in the compartment (A).
Close the lid. Make sure that the re-
lease button locks into position.
• Only the indicator of the phase in
operation stays on.
• The display shows the programme
duration that decreases with steps
of 1 minute.
display shows the delay time you
want to set (from 1 to 24 hours).
• The delay time flashes in the dis-
play.
• The delay indicator is on.
• The display shows the countdown
of the delay start that decreases
with steps of 1 hour.
• The phase indicators of the set
programme go off.
the programme starts.
– The indicator of the phase in opera-
tion comes on.
ENGLISH
27