Assembly
GB
Fig. 6: Installation of the air hose
24
10
13
7. Stick the air hose (12) a Fig. 6 ccording to into the connection of the pump (10)
8. Connect the power cable of the pump (13) according to the connection dia-
gram (see Chapter Installation)
9. Stick the outlet hose of the gas condensing boiler on the hose connection of
the inlet of the neutralisation unit ( Fig. 1 , Pos. 1)
Caution! The connection to the gas condensing boiler must be designed to be
backflow-proof!
10. Stick the outlet hose on the hose connection of the outlet of the neutralisa-
tions unit ( Fig. 1 , Pos. 9) and place with downward slope to the house drainage
(or connect with the condensate lift unit)
Caution! Inlet and outlet lines must be laid with continual downward slope! If no
free drain is possilbe, a condensate lifting unit must be used!
11. Check all connections for leaks
Neutralisation unit NEOP 300
12
7311618-02 08.13