Operation; Replacing The Power Cable; Cleaning, Maintenance And Ordering Of Spare Parts - Pattfield Ergo Tools PE-GP 650 Traduction De La Notice Originale

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 21

6. Operation

Install the equipment on a solid and level surface.
Fill the pump housing with water via the water filler screw (6). Fil-
ling the intake line will accelerate the priming process.
All the shut-off devices in the discharge line (spray nozzle, valves
etc.) must be fully opened during intake in order to permit all air to
escape from the intake line.
Connect the mains cable.
Switch on the equipment with the power switch (3) - water can be
suctioned in for up to 5 minutes (maximum suction height).
After finishing the work, switch off the equipment with the power
switch (3).

7. Replacing the power cable

Danger!
If the power cable for this equipment is damaged, it must be replaced
by the manufacturer or its after-sales service or similarly trained per-
sonnel to avoid danger.

8. Cleaning, maintenance and ordering of spare parts

The equipment is almost completely maintenance free. In order to
ensure a long service life, however, we recommend that you regularly
check and care for the product.
Danger!
The equipment must be disconnected from the power supply (pull
the power plug) prior to performing any maintenance.
Anl_PE_GP_650_SPK7.indb 143
Anl_PE_GP_650_SPK7.indb 143
- 143 -
GB
08.10.15 11:14
08.10.15 11:14

Publicité

Table des Matières
loading

Table des Matières