6. INSTALLATION
6.1 P lates
The unit is supplied with warning and attention plates as listed in the relevant table.
6.2 Dimensions
SP1 (SPO 121-123)
SP2 (SPO 221)
SP3 (SPO 135)
6.3 Location
To obtain optimal operation of the unit act as follows:
A) Place the unit in a well ventilated room, far from heat sources.
B) Limit the number of door openings.
C) Make sure that the unit has good air supply and discharge.
D) Fit a drain line to the defrost water drain connection in the lower part of the evaporator.
Solution 1
Solution 2
6.4 Free room
When installing the unit leave enough free room to allow opening, correct use and easy maintenance in safe
conditions.
6.5 Installation
Place the condensing unit on the floor.
Install the evaporator as follows:
A) Drill the holes in the ceiling keeping the necessary distance from the wall.
A
B
357
337
390
427
427
427
Solution 3
C
D
620
614
820
1034
820
1693
Installation in a
coldroom with
more than one unit
23