CTC VT 50 Manuel D'installation page 8

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 46
English
Installation
Place the buff er tank in a dry space free from freezing conditions. If
possible, it should be placed near other heating sources. The appliance
must be installed by a properly qualifi ed person in accordance with the
instructions and local regulations.
The buff er tank may be used in heating and cooling systems. The primary
purpose of the buff er tank is storage of superfl uous energy, but it can also
be used as a hydraulic switch in heating or cooling systems.
The buff er tank was designed, manufactured and tested for the storage of
hot or cold water within the scope of the limit temperatures and pressure,
indicated in the chapter "Technical data". Using the appliance in any other
way would be inappropriate and dangerous.
Make sure to leave enough space around the buff er tank for undisturbed
regular and irregular maintenance interventions (access to sensors and
connections, cleaning, deaeration etc.).
It is recommended to install a magnetic and mechanical debris fi lter in
order to ensure long-lasting functioning of the system.
P...Primary circuit
S...Secondary circuit
8
CTC VT 50 - 300
When the buff er tank is
!
used in cooling systems,
it is important that all
connections are insulated
against condensation to
prevent the build-up of
ice.

Publicité

Table des Matières
loading

Produits Connexes pour CTC VT 50

Ce manuel est également adapté pour:

Vt 100Vt 200cVt 300c

Table des Matières