Switch On And Test - BTR Netcom KAPRI plus Instructions De Service

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6. Operation

6.3 Switch on and Test

Terminate KAPRi plus Mainframe and KAPRi plus Test Box, then
start the installation test and line identification as shown below.
Œ Œ Press the Start Key (D) to turn
on the KAPRi plus Mainframe.
  During the test run, the green
LED (G) flashes.
The test is finished when the
green LED stops flashing.
Ž Ž The green LED (G) lights with-
out interruption if no errors
were detected, the installation
is OK. Press the Error Key (H) to
get the number of the connec-
ted Test Box. This number is
shown as a flashing digit in the
numeric display (B).
E9
press Start Key
The green LED flashes
The green LED
flashes without
interruption, no
errors were detected

Publicité

Table des Matières
loading

Table des Matières