Télécharger Imprimer la page

poolstar Froggi Prime Guide D'installation Et D'utilisation page 23

Publicité

Les langues disponibles

Les langues disponibles

6. Install the jumping mat (G) inside
the circle, seam side down. Fix the 1st
spring (H) into the hole on the curved
structure (A) and one of the rings sewn
on the mat. The spring hooks should
be facing down.
8. Place all the springs (H) and leave
them hanging on the canvas. To ensure
evenly distributed pressure, always at-
tach the spring (H) opposite the one you
just set. Perform this assembly every 4
or 5 holes.
Warning:
During assembly of the springs, be vigilant because the stretch of the ju-
mping mat makes this step difficult and dangerous. Take care not to hurt
yourself with the hooks.
7. Repeat step 6 directly at he opposite
side where you have attached your first
spring (H). Then attach two new springs
(H) midway of the first 2 to ensure that
the stretch is uniform and well.
9. Repeat the process for all springs (H).
Use the springs mounting tool (I).
23
EN

Publicité

loading

Ce manuel est également adapté pour:

X‑tramp premium