Installation - Kostrzewa Twin Bio Luxury Compact NE 8 Notice Technique

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 207

6. Installation

72
6. Installation
CAUTION!
INSTALL AND REMOVE BOILER COMPONENTS ONLY IF:
· BOILER IS STOPPED AND COOLED DOWN
· WIRING SYSTEM IS DISCONNECTED
· FUEL FEED SYSTEM IS DISCONNECTED
· BOILER CONTROL SYSTEM IS REMOVED (IF INSTALLED ON THE SIDE WALL)
· TRANSPORT AND STORAGE OF BOILER COMPONENTS WAS SCHEDULED IN ADVANCE DUE TO SAFETY REASONS.
a. Insulation door installation and removal.
Leader in pellet boilers
Twin Bio Luxury Compact NE v01 User Manual – EN 01.19

Publicité

Table des Matières
loading

Table des Matières