General Notes; Security; Technical Data - Graf SICKER-TUNNEL Notice D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

1.1

Security

The relevant accident prevention regulations according to BGV C22 must be observed during all work.
The relevant regulations and standards must additionally be taken into consideration during installation,
assembly, servicing, repair, etc.
Before installation, the EcoBloc Inspect and ground plates should be checked for damage.
Damaged or defective blocks must not be installed!
GRAF offers an extensive range of accessories, all of which are designed to match each other and which
can be extended to form complete systems. The use of other accessories may lead to impediments to the
system's functional capability, therefore invalidating liability for resulting damage.
Please note:
There is an increased risk of slipping on Infiltration tunnel system in frosty and wet conditions.
incl. Endplatte 1220 mm
incl. Endplatte 1220 mm
980
980
580
580
DN 100
DN 100
800
800
mail@graf.info
www.graf.info
1.

General notes

1160
2.

Technical data

1160
490
490
490
490
580
580
DN 200
400
DN 200
400
400
400
1020
1020
8 / 25
510
510
510
510
DN 100
DN 150
DN 200
DN 300
DN 100
DN 100
DN 150
DN 200
DN 300
DN 100

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Sicker-twin230010410130231004410094231002

Table des Matières