Télécharger Imprimer la page

Honeywell D06F Notice De Montage page 7

Masquer les pouces Voir aussi pour D06F:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 10
8. Commissioning
8.1 Setting outlet pressure
Set outlet pressure min. 1 bar under inlet pressure.
1. Close shutoff valve on inlet
2. Release pressure on outlet side (e.g. through water tap)
3. Close shutoff valve on outlet
4. Loosen slotted screw
o Do not remove slotted screw
5. Slacken tension in compression spring
o Turn control handle to the left (-) until it does not move
any more
6. Slowly open shutoff valve on inlet
7. Turn control handle until the setting scale shows the
desired value
8. Retighten slotted screw
9. Slowly open shutoff valve on outlet
9. Maintenance
We recommend a planned maintenance contract with
an installation company
In accordance with DIN 1988, part 8, the following measures
must be taken:
9.1 Inspection
Frequency: once annually
To be carried out by an installation company or the
operator.
1. Close shutoff valve on outlet
2. Check back pressure using a pressure meter when there
is zero through-flow
o If the pressure is increasing slowly, the valve may be
dirty or defective. In this instance, carry out servicing and
cleaning
3. Slowly open shutoff valve on outlet
MU1H-1002GE23 R0108
GB
9.2 Maintenance
Frequency: every 1-3 years (depending on local
operating conditions)
To be carried out by an installation company
1. Close shutoff valve on inlet
2. Release pressure on outlet side (e.g. through water tap)
3. Close shutoff valve on outlet
4. Loosen slotted screw
o Do not remove slotted screw
Caution !
There is a spring in the spring bonnet. It may cause
injuries if the spring is derailing.
• Make sure tension in compression spring is slak-
kened!
5. Slacken tension in compression spring
o Turn control handle to the left (-) until it does not move
any more
6. Unscrew spring bonnet
o Use double ring wrench ZR06K
7. Remove slip ring
8. Remove valve insert with a pair of pliers
9. Unscrew filter bowl
o Use double ring wrench ZR06K
10.Remove slotted ring
11.Check that sealing ring, edge of nozzle and slotted ring are
in good condition, and if necessary replace the entire valve
insert
12.Remove filter, clean and reinsert
13.Place O-ring onto filter bowl
14.Reassemble in reverse order
Press in diaphragm with finger before inserting slip ring
Screw in filter cup hand-tight (without tools)
15.Set outlet pressure
9.3 Adjusting the setting scale
If the adjustment knob is removed, this setting is lost. A new
setting can be achieved using a pressure gauge.
1. Close shutoff valve on inlet
2. Release pressure on outlet side (e.g. through water tap)
3. Close shutoff valve on outlet
4. Loosen slotted screw
o Do not remove slotted screw
5. Fit manometer
6. Slowly open shutoff valve on inlet
7. Set desired outlet pressure (e.g. 4 bar)
8. Align scale (e.g. 4) in middle of viewing window
9. Retighten slotted screw
10.Slowly open shutoff valve on outlet
7
Honeywell GmbH

Publicité

loading

Ce manuel est également adapté pour:

D06fhD06fnD06f-1/4zaD06fi