3.2.6
Connecting the charge line and data line
3.2.7
Operating panel
Page 60
www.busse-yachtshop.de | info@busse-yachtshop.de
menu
ok
!
4.
Next, insert the off-heat tube.
1.
Insert the plug on the data line (1)
into the connection socket marked "
operating panel " on the EFOY fuel
cell.
2.
Insert the plug on the loading cable
(2) into the socket connection
provided on the EFOY fuel cell.
INFO:
The device switches on as soon as
the battery charge line is plugged
in and the EFOY fuel cell is
connected to the battery.
1.
On/Off
2.
Menu
3.
Back
4.
Scroll up through menu
5.
Scroll down through menu
6.
Confirmation/OK
7.
Red LED lights up to indicate a fault
Operation