F.Bertazzoni P604IM2G5NE Notice D'utilisation page 27

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

CONNECTION OF THE HOB FOR P785IM2G5NE:
Mains
230 V~ 50/60 Hz
400 V~ 50/60Hz
400 V~ 50/60Hz
* calculated with the simultaneous factor following the standard EN 60 335-2-6
For the various kinds of connection, use the brass bridges which are in the box next the terminal
Monophase 230V~1P+N
st
Put the 1
bridge between terminal 1, 2 and 3, the 2
Attach the earth to the terminal "earth", the neutral N to terminal 4 or 5, the Phase L to one of the
terminals 1, 2 or 3.
Biphase
400V~2P+N
st
Put the 1
bridge between terminal 1 and 2, the 2
Attach the earth to the terminal "earth", the neutral N to terminal 4 or 5, the Phase L1 to the
terminals 1 or 2 and the Phase L2 to the terminal 3.
Triphase
400V~3P+N
Put a bridge between terminal 4 and 5.
Attach the earth to the terminal "earth", the neutral N to terminal 4 or 5, the Phase L1 to the
terminals 1 and the Phase L2 to the terminal 2 and the Phase L3 to the terminal 3.
Caution! Be careful that the cables are correctly engaged and tightened.
We cannot be held responsible for any incident resulting from incorrect connection or
which could arise from the use of an appliance which has not been earthed or has been
Connection
Supply cord
1 phase +N
3 x 4 mm
2 phases + N
4 x 2,5 mm
3 phases + N
5 x 1,5 mm
equipped with a faulty earth connection.
Supply cord
H 05 VV - F
2
H 05 RR - F
H 05 VV - F
2
H 05 RR - F
H 05 VV - F
2
H 05 RR - F
nd
between 4 and 5.
nd
between 4 and 5.
27
Circuit braken
40 A *
25 A *
16 A *

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

P785im2g5ne

Table des Matières