Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

2- INSTALLATION

2.1 - Un-blocking the drum
A
B
C
D
H
2.2 -Plumbing connection
The user will require a tap with a 3/4" gas screwthread outlet and a drain
situated between 50 and 80 cms. above floor level. The watermain pressure
must be between 4 and 98 N/cm² inclusively.
Proceed as follows:
-Let the water run for a while before connecting the hose.
-Connect the water inlet hose applying the rubber joint provided in the f ittings
equipment bag.
-Position the drainage hose inside a hose of a larger diameter, or rest it well
fastened against any kind of drain at the height indicated.
-Neither of the hoses should be twisted or kinked.
1 8
After removing the external packing the
d r u m mu s t b e u n - bl o c ke d b e fo re t h e
machine is used.
This is done in the following manner:
1.) Unscrew and remove the four screws A-B-C-D.
2.) Push with a screwdriver at an angle in the
screw holes until the four spacers (H) fall.
These must be recovered and kept.
3.) It is very important to recover these four
spacers (H) because they could cause damage
if they remain inside the machine and also
because they will be required to move the
m a c h i n e i n t h e c a s e o f m ov i n g h o u s e .
THERMO
H
H
C
C
C- Cold water connection.
H- Hot water connection.
The "H" connection can only be
applied in those machines f itted
for this (Bithermical).
5 I

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Waa 936 se

Table des Matières