Technical Specifications; Installation; Checks; Power Unit Mounting - Simco-Ion COBRA Notice D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4. Technical specifications

Operating voltage:
Max. intensity at emitter point:
Power unit:
Medium:
Air connection:
Air consumption:
Air displacement:
Noise level:
(measured at 30cm
distance from the gun)

5. Installation

5.1. Checks

 Check that the Cobra air gun and the power unit possibly included in the supply are
undamaged and that you have received the correct version.
 Check that the data on the packing slip corresponds with the data shown on the product
received.
 Check that the voltage shown on the rating plate corresponds with the mains voltage.
If you have any problems and/or in the case of ambiguity:
Please contact Simco-Ion or your regional agent.
5.2. Installation

5.2.1. Power unit mounting

Warning:
 Electrical installation shall be carried out by a skilled electrical engineer.
 When carrying out work on the equipment: de-energise the equipment.
-
Position / fit the power unit in the position you like, provided the switch and neon lamp are
properly accessible and visible.
-
Attach the power unit using the fixing holes in the base plate.
-
Lay the connection cable to the (mains) voltage connection.
-
Connect the connection cable or fit a plug.
Important:
 Make sure that the equipment is properly earthed. Earthing is needed to ensure proper
operation and to avoid electrical shocks upon contact.
Cobra_UM_9752050610_NL_D_GB_F_V2_0
approx. 5.1 kV AC
0.25 mA
A2A5G for 230 V art. No.: 08.05.25.5700
air or nitrogen
¼ " BSP hose (min. inside diameter: 9 mm)
400 l/min at 3.5 bar
625 l/min at 7 bar
2250 l/min at 3.5 bar
3700 l/min at 7 bar
92 dB at 2 bar
96 dB at 4 bar
101 dB at 7 bar
GB
17

Publicité

Table des Matières
loading

Table des Matières