6.
Technical Specifications
Minimum flow pressure:
Recommended operating
pressure:
Maximum operating pressure:
Calculation flow rate:
Volumetric flow:
Operating voltage:
Power consumption:
Communication:
Type of protection:
7.
Dimensions
8.
Installation Example
9.
Assembly Instructions
9.1
Make the connection for the gauging water.
☞
Check the direction of flow.
9.2
Flush the pipes in compliance with DIN 1988.
x: not included in scope of delivery
9.3
Remove the flush connector.
x: not included in scope of delivery
9.4
Insert the solenoid valve with the seals.
☞
Check the direction of flow.
9.5
Install a switch box (not included in scope of delivery ) at a height of
approx. 1200 mm.
9.6
Install a conduit (not included in scope of delivery ) leading to the switch box.
☞
To protect the tiles, use masking tape when marking and drilling.
9.7
Hold the cover plate with Piezo-button at a height (c) of approx. 1200 mm against
the wall.
9.8
Mark the drill holes.
☞
To protect the tiles, drill at a low speed.
9.9
Drill according to the markings.
Insert the dowels.
☞
Depending on the composition of the wall, special wall dowels may have to be used
(not included in scope of delivery).
9.10 Pull the extension line for the sensor line through the conduit.
1.0 bar
1–5 bar
10 bar
0.2 l/s
0.50 l/s at a flow pressure of 3 bar
24 V DC
7 W
Ethernet via ECC function controller
Electronic IP 68, solenoid valve IP 40
- 5 -