Post Installation Checklist - F.Bertazzoni REF30PIXL Notice D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Series: All

Post installation checklist

24
Check that the front levelling feet have been properly installed.
Check that the connection to the water system does not have any
leaks and that the closing tap is easily accessible.
Check that the electrical connection is correctly installed and that
the multipole switch and socket are easily accessible.
Check the perfect alignment of the appliance with adjacent
structures.
Check that all adhesive tape and external or internal temporary
protective devices have been removed.
Check the perfect closing of the doors and the smooth sliding of
the drawers and shelves.

Publicité

Chapitres

Table des Matières
loading

Table des Matières