Télécharger Imprimer la page

PROMAT 9000360080 Mode D'emploi page 15

Palan à câble électrique

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Operation with Pulley
Nominal Capacity x 2
With the lifting hook with pulley it is possible to increase the maximum lifting
capacity.
Hook the fixed lifting hook (B) into the mounting opening in the housing as shown
in the drawing (Fig. 5/6, P. III).
Do not use more pulleys to further increase the lifting capacity, the lift is not
intended for heavier loads.
Operation
1. Before starting work, make sure the EMERGENCY STOP switch (11) is in the
ON position (not pressed).
2. The hoist is equipped with two automatic turn off switches, witch turn off the
hoist on the upper and lower stop. The switch (3) stops the hoist on the upper
stop; the switch (2) stops the hoist when the cable is fully extended.
3. Three winds of the steel cable remain on the steel cable drum (5) when the
hoist turns off in fully unwound position. This is necessary for safety reasons.
4. Switch on the cable hoist by using the toggle switch (10) and press it to that
direction you intent to move the load. Do not switch straight from lower to raise,
but stop the machine in between.
By pressing the EMERGENCY STOP switch (11) you can immediately stop the
cable hoist. In order to switch on again, turn the EMERGENCY STOP switch
clockwise until the switch lifts up.
Operation with direct Lifting
11
Operation
Nominal Capacity

Publicité

loading

Ce manuel est également adapté pour:

90003600819000360082900036009090003600919000360092