Installation and assembly Universal internal fitted filter strainer
5.2

Preparations on the tank:

The overflow siphon
DN 100 supply pipe
the pipe (working from the outside in) which must protrude at least around 100 mm into the filter strainer.
5.3

Inserting the filter

The stainless steel cross bar supplied
/ max. 690 mm) and then attached to the shaft's collar. The prepared filter
tank dome from above, slid onto the supply pipe, which is protruding at least 100 mm, and fitted in the
cross bar using the previously adjusted chain suspension
Please note, that the filter basket has to be installed above the maximum water level. This prevents
that pollution in the filter decomposes and thus the water gets contaminated.
The strainer insert is removed for cleaning. During this process the strainer is rinsed thoroughly with water
until all pores are open. We would recommend cleaning every 4 - 5 weeks depending on dirt levels (more
frequently in autumn when the number of leaves present increases greatly).
After cleaning the filter strainer must always be refitted correctly or installed and fixed correctly using
the chain suspension. The overflow siphon should also be checked during maintenance and rinsed if
necessary.
Otto Graf GmbH – Carl-Zeiss-Str. 2-6 – DE-79331 Teningen – Tel.: +49 7641 589-0 – Fax: +49 7641 589-50
GRAF Distribution S.A.R.L – 45, route d´Ernolsheim – FR-67120 Dachstein Gare – Tél.:+33 388 49-7310 – Fax: +33 388 49-3280
GRAF Iberica Tecnología del Plástico S.L. – Marquès Caldes de Montbui, 114 – ES-17003 Girona – Tel.: +34 972 913767 – Fax: +34 972 913766
GRAF UK Ltd – Target House – Thorpe Way Ind. Estate – Banbury – Oxfordshire – UK-OX16 4SP – Tel.: +44 1608 661-500 – Fax: + 44 1608 665-466
is inserted (passing from the inside out) in the bottommost tank dome seal. The
(provided by the customer) is fitted to one of the top holes, this involves guiding in
1
is set to the diameter of the telescopic dome shaft (min. 570 mm
6.

Commissioning and servicing

info@graf.info
www.graf.info
2
.
8 / 16
is then guided through the
2014-05

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

330299Filterkorb

Table des Matières