Les langues disponibles

Junction
Box
Cover
Power
Supply
Wires
Electrical Connections, Back of Unit
The electrical disconnect switch with fuse
protection must be a two pole type with a minimum
of 3 mm between open contacts.
Follow all applicable local, state and national
codes.
Power Cord Replacement:
Notice: In case the power cable is damaged, it
must be replaced ONLY by QUALIFIED
TECHNICIANS to prevent any possible risks
1. Disconnect electrical power to machine.
2. Remove junction box cover.
3. Disconnect and remove existing power cord.
4. Select and obtain the proper power cord of type
H03RT-F, H05RR-F, H03VV-F, H03VVH2-F or
heavier. Ground wire must be green/yellow color.
Only one cord per plug. See Power Cord
Reference Table for suggested cord sizing.
5. Install a field supplied, non-metalic,
non-detachable strain relief per code.
6. Route the power cord through the access hole /
strain relief and properly attach the power supply
wires. Do not tin the leads. Strip 6 mm of power
cord lead insulation and properly attach power cord
wires to the lead wires in the junction box.
7. Connect an electrical plug of the proper type for
the application and country of use.
Air and Water Cooled Installation Manual
8. Attach a ground wire to the ground connection in
the junction box. Note: Ground wire must be longer
than power lead wires.
9. Reconnect power supply. Check voltage when
Ground Wire
Connection
complete.
Return the junction box cover to its original
10.
position and secure with the original screws.
Install
Strain
Relief
Final Check List
After connections,
1. Wash out the bin. If desired, the interior of the
bin could be sanitized.
2. Locate the ice scoop (if supplied) and have it
available for use when needed.
Final Check List:
1. Is the unit located indoors in a controlled
environment?
2. Is the unit located where it can receive
adequate cooling air?
3. Has the correct electrical power been supplied
.
to the machine?
4. Have all the water supply connections been
made?
5. Have all the drain connections been made?
6. Has the unit been leveled?
7. Have all unpacking materials and tape been
removed?
8. Is the correct switch bezel installed in the trim
strip?
9. Is the water pressure adequate?
10. Have the drain connections been checked for
leaks?
11. Has the bin interior been wiped clean or
sanitized?
12. Have any water filter cartridges been replaced?
13. Have all required kits and adapters been
properly installed?
March 2007