Télécharger Imprimer la page

Etalex HYBRIDE Série Manuel D'installation page 18

Publicité

STEP 5
LEVEL THE UNIT HORIZONTALY, BY ADJUSTING THE LEVELERS IN THE FRONT AND
IN THE BACK OF THE FEET TO ENSURE THE STRUCTURES ARE LEVELED AND
PLUMB.
3/4"
STEP 6
INSTALL THE TOP CAP (ITEM#3) ON TOP OF THE STRUCTURE, INSERT THE KICK
PLATE (ITEM#2) ON THE FRONT EDGE OF THE BASE SHOE, AND INSTALL THE BASE
SHELF (ITEM#8) TO STABILIZE THE STRUCTURE.
ITEM#2
TITLE
I:\dessins\INSTRUCTION\INS-001\INS-001017.idw
NOTE : INSTALL WALL
SECTION LEANING
1
WALL UNIT
STANDING POSITION
ITEM#3
ITEM#8
S RIE HYBRIDE
HYBRID SERIES
BACK 1
1/2"
GONDOLA
C
DRAWING
INS-001017
DETAIL C
PAGE
REV
-
18
21
OF

Publicité

loading