Page 1
S RIE HYBRIDE HYBID SERIES MANUEL D'INSTALLATION INSTALLATION MANUAL MURALE GONDOLA WALL UNIT MANUFACTURIER D' TAG RES M TALIQUES ET SYST MES D'ENTREPOSAGE 8501, Jarry Est, Montr al (QC) Canada H1J 1H7 service la client le : 1 800 351-3125...
Page 2
COMPOSANTES ITEM #2 ITEM #3 PLINTHE CAP R GULIER ITEM #4 ITEM #5 DOS UNI DOS PERFOR M TAL 7 1/4" H 14 1/2" H ITEM #1 ITEM #6 ITEM #7 POTEAU BOUT HD COUVERT DE PIED COUVERT DE PIED GAUCHE DROIT ITEM #8...
Page 3
OUTILS PERCEUSE LECTRIQUE NIVEAU MAILLET EN CAOUTCHOUC CL NIVELEUR TITRE DESSIN PAGE S RIE HYBRIDE INS-001017 HYBRID SERIES I:\dessins\INSTRUCTION\INS-001\INS-001017.idw...
Page 4
VUE EXPLOS E L T S RIE HYBRIDE LISTE DE MATERIEL ITEM DESCRIPTION POTEAU HD BOUT PLINTHE CAP R GULIER DOS UNI 7 1/4" DOS PERFOR OU UNI 14 1/2"H COUVERT DE PIED GAUCHE (LOWBASE) COUVERT DE PIED DROIT (LOWBASE) TABLETTE DE BASE TABLETTE SUP RIEURE SUPPORT DROIT DE TABLETTE...
Page 5
TAPE 1 TRACER UNE LIGNE DE REP RE SUR LE SOL POUR LOCALISER LA RANG E ET TENDRE LES POTEAUX (ITEM#1), PIEDS (ITEM#11), LES PLINTHES (ITEM#2) ET LES DOS AU LONG DE LA LIGNE. ITEM#1 ITEM#11 LIGNE REP RE ITEM#2 TAPE 2 INS RER LES DENTS DES PIEDS (ITEM #11) AU BAS DU POTEAU (ITEM#1).
Page 6
TAPE 4 PLACER LES POTEAUX DEBOUT ET ASSUREZ- VOUS QUE LES PARTIES SOUD ES DU POTEAU SONT FACE FACE POUR GLISSER LES DOS DE CHAQUE C T (AVANT ET ARRI RE). EN PREMIER, INS RER LES DOS DE M TAL UNIS DE 7 1/4" H SUIVI DES DOS DE M TALS DE 14 1/2"...
Page 7
INSTALLATION D'UNE MURALE INS RER VERTICALEMENT L'ATTACHE MURALE L'ARRI RE DU POTEAU. FAIRE PIVOTER L'ATTACHE DE 90 DE MANI RE LA BLOQUER EN PLACE. S CURISER LE TOUT EN L FIXANT AU MUR AVEC LES VIS BOIS T TE PLATE NO 8 X 1/2" L SUR LE BLOCAGE. VIS BOIS T TE PLATE ATTACHE MURALE NO 8 X 1 1/2"...
Page 8
TAPE 5 METTRE NIVEAU EN AJUSTANT LES NIVELEURS L'AVANT ET L'ARRI RE AFIN DE S'ASSURER QUE LA STRUCTURE EST DE NIVEAU (HORIZONTAL). CECI EST N CESSAIRE ET FACILITE L'INSTALLATION DES TABLETTES ET DES ACCESSOIRES. NOTE : INSTALLER LES MURALES AVEC UN ANGLE DE 1 VERS L'ARRI RE.
Page 9
TAPE 7 INS RER LES COUVERTS DE PIEDS (ITEM#6-7) L'EXTR MIT DES RANG ES. INSTALLER LES SUPPORTS (ITEM#10) ET LES TABLETTES SUP RIEURES (ITEM#9) LA HAUTEUR D SIR E. ITEM#9 ITEM#10 COUVERT DE PIED GAUCHE (ITEM#6) COUVERT DE PIED DROIT (ITEM#7) TITRE DESSIN...
Page 10
Ne pas combiner les produits Etalex avec Aucune tablette ou accessoire ne doit des produits non Etalex. d passer le devant de la tablette de base.
Page 11
CALCUL DES ILOTS D S QUILIBR POUR LES MURALES CHARG ES LOURDEMENT OU LORS DE CHARGEMENT OU DE D CHARGEMENT D LOTS, IL EST IMPORTANT DE D TERMINER SI VOUS CR EZ UNE CHARGE MAL QUILIBR E QUI EXC DE LE MAXIMUM PERMIS.
Page 12
COMPONENTS ITEM #3 ITEM #2 KICK PLATE TOP CAP ITEM #4 ITEM #5 PLAIN METAL BACK PERFORATED METAL BACK 7 1/4" H 14 1/2" H ITEM #1 ITEM #6 ITEM #7 HD END POST LEFT RIGHT SHOE COVER SHOE COVER ITEM #8 ITEM #9 ITEM #10...
Page 13
TOOLS DRILL RUBBER MALLET LEVEL LEVELER KEY TITLE DRAWING PAGE S RIE HYBRIDE INS-001017 HYBRID SERIES I:\dessins\INSTRUCTION\INS-001\INS-001017.idw...
Page 14
EXPLODED VIEW HYBRID SERIES GONDOLA PART LIST ITEM DESCRIPTION HD END POST (UPRIGHT) KICK PLATE TOP CAP PLAIN METAL BACK 7 1/4" H PERFORATED METAL BACK 14 1/2" H LEFT SHOE COVER RIGHT SHOE COVER BASE SHELF UPPER SHELF BRACKET BASE SHOE 12 13 HYBRID SERIES WALL UNIT...
Page 15
STEP 1 TRACE A CHALK LINE ON THE FLOOR FOR DESIRED LOCATION OF GONDOLA AND LAY DOWN THE END POST (ITEM#1), BASE SHOE (ITEM#11) AND THE KICK PLATE (ITEM#2) ALONG THE CHALK LINE. ITEM#1 ITEM#11 CHALK LINE ITEM#2 STEP 2 INSTALL THE BASE SHOE (ITEM#11) AT THE BOTTOM OF THE END POST (ITEM#1).
Page 16
INFORMATION FOR ANCHOR STEP 3 (ONLY THE WALL UNIT) INSTALL THE WALL ANCHOR BRACKET (ITEM#12) ON THE WALL AT THE TOP OF EACH END POST. INSERT THE TOOTH OF THE ANCHOR IN THE FIRST SLOT FROM THE BACK BY TURNING IN THE POSITION AND FIX IT WITH THE WOOD SCREW NO 8 X 1 1/2" L. WOOD SCREW PAN WALL ANCHOR SOCKET...
Page 17
STEP 4 PLACE THE END POST IN VERTICAL POSITION AND BE SURE THE WELDED STRIPS OF THE END POSTS ARE FACE TO FACE TO BE ABLE TO SLIDE IN FIRST THE 7 1/4" H METAL BACK FOLLOWED BY THE 14 1/2" H METAL BACK.
Page 18
STEP 5 LEVEL THE UNIT HORIZONTALY, BY ADJUSTING THE LEVELERS IN THE FRONT AND IN THE BACK OF THE FEET TO ENSURE THE STRUCTURES ARE LEVELED AND PLUMB. NOTE : INSTALL WALL SECTION LEANING BACK 1 1/2" WALL UNIT GONDOLA 3/4"...
Page 19
STEP 7 INSERT THE SHOE COVERS (ITEM#6-7) ON THE BASE SHOES AT BOTH ENDS OF THE STRUCTURE AND INSTALL THE BRACKETS (ITEM#10) AND UPPER SHELVES (ITEM#9) AT THE DESIRED HEIGHT. ITEM#9 ITEM#10 LEFT SHOE COVER (ITEM#6) RIGHT SHOE COVER (ITEM#7) TITLE DRAWING PAGE...
Page 20
No shelves or accessories should project past Do not combine Etalex products with non the front of the base shelf. Etalex products. Do not move an assembled unit, especially Local codes and regulations concerning if merchandised.
Page 21
UNBALANCED LOAD CALCULATION FOR A WALL SECTION HEAVY LOADED OR WHEN LOADING OR UNLOADING AN ISLAND. IT IS VERY IMPORTANT TO DETERMINE THAT YOU WILL NOT CREATE AN UNBALANCED LOAD THAT WILL EXCEED THE LIMIT PERMITTED. THE EXAMPLE SHOWN BELOW WILL SHOW YOU HOW TO CALCULATE IF YOU HAVE AN UNBALANCED LOAD IN LBS/INCH.