Inspection And Handling - Airwell K OG 30 LN 2T Manuel D'installation

Masquer les pouces Voir aussi pour K OG 30 LN 2T:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

3
3.3

INSPECTION AND HANDLING

In the event of shipping damage, write
precise details of the damage on the shipper's
delivery note and send a registered letter with
acknowledgement of receipt to the shipper within
48 hours, clearly stating the damage caused.
Forward a copy of the letter to the manufacturer
or their representative.
N.B. Writing "subject to unpacking" on the delivery note is
not sufficient for the shipper's insurance company.
WARNING !
The sharp edges and surfaces of the coils can
cause injury. Avoid contact with them.
CHILLED WATER CASSETTE
G
eneral
continueD
IIt is recommended to place the cassette as near as
possible to the final installation site before unpacking.
Avoid placing heavy tools or weights on top of the packed
cassette.
On opening the carton, check that all the accessories
required for installation are present.
Keep the fascia grille in its packaging until it is to be
finally installed.
DO NOT LIFT THE CASSETTE BY THE
CONDENSATE EVACUATION TUBE
7

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

K og 45 ln 2tK og 45 ln 4t

Table des Matières