Start Operation; Control Panel - CONTINENTAL EDISON CAVE CECWC2Z77C Guide D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Start operation

1. Cleaning the compartment
Before power on, clean inside of the appliance and check the drainage pipe in good connection.(For
details, please refer to the "Maintenance and cleaning")
2. Put the appliance stand still
Before power on, level the appliance on the firm & dry floor for at least 30 minutes.
3. Power on
The appliance start operation and it will cool down inside after 1 hour, otherwise you should check the
power connection.

Control panel

If the keys are not active, please unlock first by pressing
simultaneously for 3 seconds
ON/OFF
1. Keep pressing the key 3 seconds, power down, goes to stand-by mode.
2. Keep pressing the key again 3 seconds to return back to normal working.
Light
Press the key, turn on or turn off the LED lights inside. In stand-by mode, the key is invalid.
Zone switch
Press the key to switch between upper zone and lower zone for choosing which zone to set
temperature. Press the key once, the LED display in chosen zone flash regularly. Press up and
down key to set temperature. Press the key again; switch the zone to set temperature.
UP
Press the key once, LED Display in regular flash showing current set temperature. Continue pressing
to adjust set temperature, one press increase 1℉. Regular flash quit after 5 seconds
detecting no press and new set temperature save. LED display return to show actual
"
on/off
30
"
"
"
and
Light

Publicité

Table des Matières
loading

Table des Matières