dirna Bergstrom bycool green line COMPACT 3.0 DAF Instructions De Montage page 22

Masquer les pouces Voir aussi pour bycool green line COMPACT 3.0 DAF:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

COMPACT 3.0
EN
Fasten supports tightening nuts until outside
14
EPDM joint (Point 4a) of equipment is
compressed, between 3 and 6 mm; joint
EPDM must stay with a thickness of 19 and
22 mm.
Important: To avoid water from filtering inside
cabin, check EPDM joint tightening with
Compact base, as indicated on diagram.
3-6mm.
Cabin roof
Fasten selflocked nut until
EPDM gasket is
compressed between 3
14
and 6 mm.
Tighten (4) M8 nuts to support and (4) to Unit
15
base.
EPDM gasket
10 mm*
(*) (approx. after tightening)
Base
Support
22
Air conditioning for vehicles
Check compression
thickness using a
tape measure in the
four corners.
EPDM gasket
14
15

Publicité

Table des Matières
loading

Table des Matières