2. Install the beer tower assembly and the mixed ball valve:
a) Plug the beer tower assembly into the top cover of the beer dispenser:
3.0" tower: This does not require a tower
buckle. Put beer tower directly over the
hole at the top of the beer dispenser's
upper surface. Fix the beer tower assem-
bly with screws directly on the upper sur-
face of the beer dispenser. (See Fig. 3).
2.5" tower: This requires the tower buckle.
Place the beer tower at the hole in the upper surface of the beer dispenser at an
inclination of 60°, and rotate 60° clockwise along the card slot. Be sure the tap is facing
toward the front of the machine. Attach the beer tower with washers (See Figure 4).
b) Take out the accessories of the mixed ball valve. Attach the transparent hose to the beer
outlet of the mixed ball valve (See Figure 5).
3. Install CO
gas cylinder and CO
2
a) Fix the two CO
CO
tube (See Figure 6).
2
b) Connect the ends of the red CO
respectively to the CO
mixed ball valve and the round outlet of
the CO
regulator valve. Lock these
2
connections firmly with the two clamps on
the red CO
tube (See Figure 7).
2
c) Using the wrench, tighten the CO
outlet of the CO
d) Place the CO
2
regulator valve component into the
cabinet and fix the CO
with tank bracket and bolt (See
Figure 8).
regulator valve:
2
hose clamps on the red
2
tube
2
intake port of the
2
regulator table valve with the hex nut port to the gas
2
tank (See Figure 8).
2
tank and CO
2
tank
2
CO
regulator
2
valve
Safety switch
Red CO2 tube
Bracket and retainer
of CO
tank
2
10
Regulating
table
CO
gas
2
cylinder