3.INSTALLATION AND CONNECTION
3.1 Installation illustration
Installation items:
The factory only provides the main unit and the water unit; the other items illustrated in the
diagram are system parts and are provided by the user or installer.
Attention:
Use the following procedure during initial start up.
1.Open valve and fill with water.
2.Make sure that the pump and the water-in pipe have been filled with water.
3.Close the valve and start the unit.
Installation must be performed in accordance with the requirements of NEC and CEC
by authorized personnel only.
Chlorinator cell
Water inlet
Sand filter
(or other type filter)
Water outlet
Water pump
4
Valve
Water supply
Pool