Mitsubishi Electric PEFY-WP10 VMS1-E Manuel D'installation page 4

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 22
7
[Fig. 7.2.1]
C
B
A
D
E
F
[Fig. 7.2.3]
A B
C
D
D
A To outdoor unit
B End connection (brazing)
C HBC controller
D Indoor unit
E Twinning pipe (field supply)
F Up to three units for 1 branch hole; total capacity: below 80 (but in same mode,
cooling/heating)
[Fig. 7.2.4]
C
A
B
D
8
[Fig. 8.0.1]
E
B
9
[Fig. 9.1.1]
~220-240V
[Fig. 9.2.1]
B
A
M1M2
M1M2
S
1
TB3
TB5
4
A Locally procured insulating material for pipes
B Bind here using band or tape.
C Do not leave any opening.
D Lap margin: more than 40 mm
E Insulating material (field supply)
F Unit side insulating material
Water pipework is screw
connections
E
D
D
D
D
F
*1
A Indoor unit
E
B Water pipe: From HBC unit
C Water pipe: To HBC unit
D Strainer (40 mesh or more)
(field supply)
E Shut off valve
E
(field supply)
D
C
A
B
C
C
C
C
A
2
M1M2
S
1
2
TB15 TB5
TB15
C
C
7.2
[Fig. 7.2.2]
A
116
70
A Water pipe: To HBC unit
B Water pipe: From HBC unit
Note:
*1. Connection of multiple indoor units with one connection (or joint pipe)
Total capacity of connectable indoor units: Less than 80
Number of connectable indoor units: Maximum 3 Sets
Selection of water piping
Select the size according to the total capacity of indoor units to be installed
downstream.
Please group units that operate on 1 branch.
F
A Air inlet
B Air outlet
C Access door
D Ceiling surface
E Canvas duct
F Air filter
A
G
G Inlet grille
9.1
A Ground-fault interrupter
D
B Local switch/Wiring breaker
C Indoor unit
C
D Pull box
9.2
[Fig. 9.2.2]
B
A
M1M2
M1M2
S
TB3
TB5
TB5
C
B
A
M1M2
S
A Terminal block for indoor transmission
cable
B Terminal block for outdoor transmission
cable
C
C Remote controller

Publicité

Table des Matières
loading

Table des Matières