Foam Installation; Packing List - Zoef Robot Maarten ZB20A Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4.4 Foam installation

Please refer to following operation if it is difficult for the cleaner to climb the wall and clean the
waterline. The following operation is not necessary if the cleaner climbs the wall well.
Open the top cover and glue the float block at the position shown in the below picture. The other
side is also glued.
Note:
1. You can also glue the float block on the top cover without removing the cover. Touch the
position with your hands and glue it according to the picture.
2. The float block has glue on its back, so It must be glued on the top cover tightly and then put it
into the pool 24 hours later.
V. Packing list
Item
1
2
3
Cleaner
4
5
Name
Cleaner body
Charger
Hook
Foam
User manual & safety rope
8
QTY (pc)
1
1
1
2
1

Publicité

Table des Matières
loading

Table des Matières