Commissioning
Figure 7-1: Connect the cable end
8
Commissioning
Only operate the appliance when completely assembled!
Before commissioning, ensure that:
• the appliance has been installed in accordance with the standards,
• the connections have been correctly made,
• the appliance is not damaged.
9
Servicing
Observe the relevant national regulations in the country of use!
The device should only be cleaned using a moist clean rag.
The following must be checked during maintenance:
• that the cable is securely seated,
• compliance with permitted temperatures to 50014,
• function in accordance with regulations.
10 Transport, storage
Transport and store the appliance in its original packing only.
11 Disposal
When disposing of the appliance, observe the national standards for refuse disposal.
8
Signal horn Type 8491/1
hazardous zone
BR
L (+)
N (-)
BL
hazardous zone
'e' connection box
BR
L (+)
N (-)
BL