Commissioning; Adjusting The Operating Voltage - Nouvag TCM Endo V Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

TCM Endo V

6.1 Adjusting the operating voltage

mains voltage (back), the operating voltage can be switched over on the fuse casing.
1)
Pull out mains plug.
2)
Open fuse compartment with a screwdriver.
3)
Pull out grey fuse holder together with the fuse from the fuse drawer.
Insert back grey fuse holder according to local mains voltage. →The correct mains voltage should
4)
now appear in the small window of the fuse drawer!
5)
Insert grey fuse holder again and close fuse compartment.
6)
Check displayed mains voltage on fuse compartment.
7)
Plug in mains plug again.

6.2 Commissioning

1)
Connect on/off footpedal on footpedal jack (back!)
(→ If motor control through footpedal is required)
2)
Connect motor on motor jack (back).
3)
Couple contra angle on motor until it locks into place and check fit by slightly pulling in the
opposite direction.
4)
Put file onto contra angle (also see chapter 7.10 Replacing the file):
Adjust file with slight pressure and rotation until it locks into place.
Check whether the file is correctly fixed with a slight pull.
Fold up contact bow, so that the file lies between the labial bars.
Fold up contact bow up to the end position of the file.
Check fit of the contact bow.
RISK OF INJURY!
The contact bow must constantly touch the file, respectively be folded up as far as its
end position. Otherwise the Apex distance cannot be measured.
5)
Insert lip connector on lip connector socket.
Please make sure that the operating voltage and the local voltage are in agreement!
F F F F
6)
Establish mains connection.
The device is now operational!
6
6 Commissioning
If the set operating voltage of the device does not agree with the local
NOUVAG AG
No. 31943 35/05

Publicité

Table des Matières
loading

Table des Matières