Installing And Connecting The Control Box; Tools Required; Mounting The Control Box - Dometic Waeco PerfectView Accessory Switch200VTO Instructions De Montage Et De Service

Masquer les pouces Voir aussi pour Waeco PerfectView Accessory Switch200VTO:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 26

Installing and connecting the control box

6
Installing and connecting the control box
6.1

Tools required

For installation and assembly, you will need the following tools:
 Measuring ruler (fig. 4 4, page 4)
 Centre punch (fig. 4 5, page 4)
 Hammer (fig. 4 6, page 4)
 Drill bit set (fig. 4 7, page 4)
 Electric drill (fig. 4 8, page 4)
 Screwdriver (fig. 4 9, page 4)
To establish and test the electrical connection, the following tools are required:
 Diode test lamp (fig. 4 1, page 4) or voltmeter (fig. 4 2, page 4)
 Insulating tape
 Heat shrinking sleeve
 Hot air blower (fig. 4 10, page 4)
 Crimping tool (fig. 4 11, page 4)
 Soldering iron (optional) (fig. 4 12, page 4)
 Solder (optional) (fig. 4 13, page 4)
 Cable bushing sleeves (optional)
To fasten the cables you may require additional cable binders.
6.2

Mounting the control box

The control is supplied ready for installation.
➤ Install the control box in a location protected from water near the monitor, preferably
under the dashboard.
Make sure you consider the length of the cable.
➤ Attach the control box using the supplied screws.
22
PerfectView SWITCH200VTO
EN

Publicité

Table des Matières
loading

Table des Matières