Installation Procedure - CPED INITIAL Mode D'emploi

Masquer les pouces Voir aussi pour INITIAL:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

The numbers in bold refer to the marks in chapter INSTALLATION - OVERVIEW
Step
Tighten the hydraulic block
Check the network pressure
Check the power outlet
Insert a tap for non-softened water (14)
Install the pre-fi lter (7)
Install the by-pass (12)
Note: the shown by-pass is wall-mounted single
block brass by-pass
22
Manual SOFTENER FER27-A6X code P0011148 - Rev 1 - 15/03/2017

INSTALLATION PROCEDURE

Directions
The preliminary tightening of the hydraulic block
upon the vessel is crucial because untightening
during transportation may have occurred.
The pressure shall be between 1.5 et 7 bars.
Above 5 bars, install a pressure reducer.
Check that there is a power outlet of 230 V at less
than 1.20 meters.
In case you need to keep raw water (for example
for gardening, etc.)
Place and connect the fi lter upstream from the
softener.
Comply with the water fl ow direction as shown
on the fi lter head.
Fix the fi lter head on the wall with the bracket,
without tightening too much the screws on the
fi lter head.
Install the bypass on the pipe complying with the
water fl ow direction.
Turn the bypass tap into the softener by-pass
position.

Publicité

Chapitres

Table des Matières
loading

Table des Matières