The installation of the equipment should
be carried out in this order:
A. System configuration.
B. Pipe connection.
C. Start-up of the system.
1. Water to be treated.
2. Soft water towards the house.
3. Drain tube.
4. Water to be treated.
5. Overflow line.
Note: This configuration is a typical
installation
for
installation may differ. Install a pressure
regulating valve and a check valve, when
necessary, in the water supply of the
softener. The by-pass may be installed
with the connections either upwards or
downwards, whilst respecting the inlet
and outlet connections towards the
head, which have embossed marks.
1. The system must always be installed
with the supplied by-pass valve.
Additionally, a three-valve by-pass
can be installed.
2. Close the general water supply valve,
which should be next to the main
pump or the water-meter.
12
2
Provides an air gap for all
drainage lines. See page 11
for further information.
the
Ergo.
Your
3. Open all taps in order to empty the
pipes from all water.
Note: Make sure that the heater is
not emptied, in order to prevent any
damage.
'DANGER'. There is a danger of
injury due to an excess of weight. It
is necessary that at least two people
move and install the system, as well as
move and rise the salt bags. There is a
danger of back injuries and other body
injuries.
4. Move the water softener towards the
installation location. Place it on an
even surface. If necessary, place it on
a plywood platform with a minimum
thickness of 2cm. Then, level the
platform using a wedge.
Minimum
depth of 2cm
Plywood
Plywood
Wedge to level the platform
Installation surface
'WARNING'. Do not place the
wedges directly underneath the
salt tank. The weight of the tank filled
with water and salt may cause the tank
to break against the wedge.
5. First make a visual check and clean
the inlet and outlet connections of the
softener to remove any residues.
6. Assemble the by-pass in the body of
the valve by previously lubricating all
joints with the lubricant supplied.
7. The tubes and accessories used to
connect the main supply pipe to the
inlet and outlet of the water softener
valve must be loosely measured,
cut and assembled. Please keep all
fastenings, joints and tubes centred
and straight. Check that water flows
from the pipe towards the inlet of the
water softener.