GB
INSTALLATION (See drawing)
230V
PTT double
plug
3
PTT wall
socket
Option :
Special cable to link two CL2's
(ref.: CL2RJ11/RJ11)
1 - Connect the PTT line cord.
2 - You have the option of connecting your telephone in the double plug.
3 - Connect the PTT double plug in the wall socket.
4 - If necessary connect the required shaker (SHAKCL_BLK only) to the
shaker plug.
5 - Connect the adaptor line cord.
6 - Connect the adaptor in the wall socket. (*)
(*) Classified "hazardous voltage" according to EN60950 standard.
Electrical connection : The apparatus is designed to operate from a 230V 50Hz supply
only. (Classified as «hazardous voltage» according to EN60950 standard).
The apparatus does not incorporate an integral power on/off switch. To disconnect the
power, either switch off supply at the mains power socket or unplug the AC adaptor. When
installing the apparatus, ensure that the mains power socket is readily accessible.
Telephone connection : Voltages present on the telecommunication network are classified
TNV-3 (Telecommunication Network Voltage) according to the EN60950 standard.
AC/DC adaptor
5
2
Screw wall mount access
1
4
CL2
For product support & help
www.geemarc.com
or Telephone 01707 384438
CL2
For product support & help
www.geemarc.com
or Telephone 01707 384438
(ref.: SHAKCL_BLK only)
Door Bell
Button
Door Bell
Option : Shaker