Uberhaus GAZEBO 38115172 Guide De L'utilisateur page 7

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Fig.6: Attach front beams (B1/B2) to posts (A3/A4) with bolts (DD), flat washers (BB)
Fig.7: Connect back beam 1/ beam junction 2/ back beam 2 (C1/H1/C2) with bolts (DD), bolts (LL), flat washers (BB).
Fig.8: Fix back beams (C1/C2) to posts (A1/A2) with bolts (CC), flat washers (BB).
Fig.9: Fix beam junction 3 (H3), support beam 1/2/3/4 (F1/F2/F3/F4) and beam junction 2 (H2) with bolts (II), flat
washers (BB), nuts (JJ)
Fig.10: Fix support beam 2/4 (F2/F4) to right side beam (D2) with bolts (DD), flat washers (BB), repeat this step for
beam 1/3 (F1/F3) and left side beam (D1)
Fig.11: Fix support bar (K) to left side beam (D1) and front beam 1(B1) with bolts (DD) and flat washers (BB). Repeat
this step for
Hardware Pack 2
Part
BB
AA
DD
LL
GG
KK
Description
M6 Flat washer
M6X15 Screw
M6X25 Bolt
M6X25 Bolt
M6X80 Anchor
Φ8*180mm spike
Quantity
44
14
22
8
4
14
Image

Publicité

Table des Matières
loading

Table des Matières