MACHINE INSTALLATION

Fig.1

PACKING AND STORING

All machines are packed in cardboard boxes specific for each unit. The units
must be handled manually.
The indications required to correctly handle the appliance while storing and
installing it are written on the packing.
The storage temperature must be between -25°C and 55°C.
Note: Do not throw the packing away exteriors to avoid environmental pollution.
Once the place in which the unit is to be installed has been chosen (see the
relative sections) proceed as follows to unpack the two units:
Outdoor unit:
1. Cut the two nylon straps.
Fig.2
2. Remove the cardboard box.
3. Remove the nylon wrapping.
Indoor mural unit:
1. Cut the two nylon straps.
2. Open the top part of the cardboard box.
3. Take hold of the unit and lift it until it is completely free from the packaging.
4. Remove the side protections and nylon wrapping.

INSTALLATION DIAGRAMS

Fig.3
The indoor unit may be installed on top of the outdoor one and vice versa.
Outdoor unit positioned at the bottom and indoor unit on the top.
In this case a trap (6) must be made on the intake piping (3) to halt the
downflow of refrigerant and to avoid liquid returning to the compressor. The
relative connection pipes must be insulated.
Key:
1. Outdoor unit
2. Indoor unit
3. Piping on gas side (larger diameter)
4. Piping on liquid side
5. Condensation drain pipe
6. Trap
Note: The maximum difference in level between the indoor unit and outdoor
unit must not exceed the values given in the
"LIMITS TO THE LENGTH AND
HEIGHT DIFFERENCE OF REFRIGERANT
PIPES"
section.