4.2
How to install the product
Tools required:
•
Pencil
•
Drill (8mm)
•
Crosshead screwdriver
•
Self-retracting metal tape measure
•
Spirit level
To install the product:
1.
Make sure that the power cable is disconnected from the wall socket.
2.
Attach the two air flaps to the one-way valve on the cooker hood.
3.
Place the hanging board against the ceiling. Determine the position of the
twelve holes for the plugs and the hole for the expansion pipe. WARNING!
Make sure that the ceiling can bear at least 120kg and that the thickness of the
ceiling is at least 30mm.
4.
Remove the hanging board. Drill the twelve holes with the 8mm drill. Insert
twelve wall plugs. NOTICE For a cement ceiling, use a 6mm drill to drill the four
holes and insert the ST6 x 60mm screws.
5.
If you have an outlet, drill or saw a hole with a diameter of 160mm in the ceiling.
Attach the hanging board to the ceiling with twelve M6 x 40mm screws.
NOTICE For a cement ceiling, use a 6mm drill to drill the four holes and insert
the ST6 x 60mm screws.
42 |
VESTEL VHIA90AX - VHIA90AS